Project Scheduling with Time Windows and Scarce Resources : Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Klaus Neumann, Christoph Schwindt, Jurgen Zimmermann

Project Scheduling with Time Windows and Scarce Resources : Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions - 1
Resumo
Ver tudo
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing...

Artigo indisponível

Resumo

A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
Publicidade

Avaliações dos nossos clientes

Project Scheduling with Time Windows and Scarce Resources : Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Sê o primeiro a dar
a tua opinião sobre este produto

Características

Editora

Springer-Verlag Berlin and Heidelberg GmbH & Co. KG

Idiomas

Inglês

Número de páginas

385

Encadernação

Capa Mole / Paperback

Dimensão

235 x 155 x 21

Comprimento

15,5 cm

Largura

208,3 cm

Altura

23,5 cm

Peso

611 g

Data de lançamento

18/07/2012

Tema

Engenharia de software

Edição

2nd ed. 2003. Softcover reprint of the original 2n

Origem

Germany

EAN

9783642072659

Publicidade
Publicidade